Measure the complete route from unloading point to final position before confirming large or heavy equipment.
Measure every constraint
Record corridor width, ceiling height, turns, lift dimensions, door clearances, thresholds and temporary obstructions along the route. Measure packaging as well as the equipment where possible.
Plan safe handling
Confirm who will unload and move the item, what equipment is needed and where it can be staged. Coordinate building access and delivery timing with site management.
Confirm before dispatch
Share measurements and photos with the supplier or installer and ask them to verify the route. Do not assume a product will fit because its listed width is smaller than the doorway.